Two new picnic tables were built (plan)  in August 2018 by owner Paul Schmeil with painting assistance from granddaughters Jane & Ruby and with the Association paying for the materials.  

Other projects that Paul donated time this summer in helping to maintain Coffee Creek Condos include:

  • LED Light Bulb Replacement – Problem: The 5,000-hour LED bulbs were failing one year after installation.  Replaced 112 Led bulbs with a 25,000-hour LED bulb which is expected to have a 5.7-year life when operated 12 hours per day. (Note that the life expectancy of a 5,000-hour bulb is about 1.15 years.)  Also, installed new fixtures at units 26, 36, 37, & 39.
  • Leveled the Pedestrian Bridge Next to Road Bridge – One corner was raised about 4.5 inches.  The pathway to the bridge needs to be raised as part of the asphalt job.
  • Pool Area – Replaced First Aid kit, fixed the shower, and replaced door on top of the pool equipment building.  NOTE: The pool equipment building needs to be re-roofed.
  • Asphalt Patches – Identified 6 areas (total 667 sq. ft) needing asphalt patches to eliminate trip hazards. 
  • Painting the Docks – Worked with Randy to get the docks painted.
  • Dry Rot – Worked on Units 39, 41,42 and 44 to replace dry rot.